Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
---|---|
Condition: | New |
Drill Hole Diameter: | 150-350mm |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The rig is the overall structure, can be adjusted in three dimensions, achieve 360 ° construction, and is equipped with steel crawler walking chassis, the machine moving quickly and convenience of construction in different environment, gripper adopts double clamping, can be achieved remove the drill pipe and casing automatically. The device uses high pressure circulating water, and using dynamic impact on double tube rotary drilling construction in sandy pebble formation or unstable fracture formation construction. The efficiency is higher than in the past conventional methods of construction.
Full hydraulic pressure control, solid fuselage structure. Advanced design concepts, monitoring instrument, convenient to operation, ensure the practical performance. The equipment adopts motor as the main source of power, And equipped with a 18 kw of small diesel engine as power when walking , getting on and off. Total power of 90 kw motor, power of head rotation is 65 kw, so the drilling rig rotary torque is twice as large as the same type, impact and the lifting force is very strong, high working efficiency, and can be multi-usage, give priority to with slope anchoring engineering construction, can also be widely used in construction of deep foundation pit, subway, tunnel, railway and the anchor construction of highway, geological disaster management and a small pile of construction.
The Innovation Points
1. Use chassis of floating structure, can be change Angle of departure of drilling rig and approach angle in a certain range;
2. Using large torque and hydraulic impact rotary power head, can adapt to more than 95% of the formation of construction;
3. The structure of multidimensional connecting rod Angle changed, can make the rig 360 ° in three-dimensional space arbitrarily change the Angle of the borehole;
4. Using electric motor and diesel engine can cope with different construction environment and construction conditions;
5. With double gripper can complete automatic shackle function;
6. Use chain times speed, large hydraulic feed, feed stable and reliable, which can realize double pipe drilling, and following pipe drilling.
Drilling Capacity | |||||
drilling angle | drilling diameter | Final hole diameter | drilling depth | Remark | |
0-360º | dia.89 102 114 | dia.150-350mm | 140-250m | Clay layer,sand bed,Pebble bed | |
Drive Rotation Head | |||||
Rotation speed | Forward rotation | 29r/min | 63r/min | 58r/min | 126r/min |
Reverse rotation | 29r/min | 63r/min | 58r/min | 126r/min | |
Strike | Strike pressure | Flow | Frequency | Impact energy | |
15Mpa | 117L/min | 1300 times | 450j | ||
Maximum Torque | 10000N.m | ||||
Feed Mechanism | |||||
Feed travel | Maximum thrust | Maximum pull | Speed | Pull speed | |
3500mm | 62kn | 94kn | 4/16.8m/min | 6/24m/min | |
Crawler Chassis | |||||
Tractive effort | 100KN | Ground bearing | 0.068Mpa | Traveling speed | 1.5km/h |
Climb ability | 20º | Capacity of bearing | 11t | Crawler specification | 450*135*37 |
Chassis height from the ground | 400mm | Crawler length | 3965mm | Output torque | 1400N.m |
Power Machine | |||||
Diesel engine | CHANHCHAI Diesel | 18kw | 2200r/min | walking and transport | |
Electric Motor | Y160M-4 | 45+45kw | 1480r/min | Normal Construction | |
Diemension And Weight | |||||
Dimensions And Size | 6500*2200*2650mm | ||||
Weight | 10.5t |
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2. How is the quality of your machine?
Our products pass strict quality inspections before they leave the factory to ensure that they are qualified before they are shipped.
3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.
5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.
6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.