High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel

Product Details
After-sales Service: Online Support,Field Maintenance
Warranty: 1 Year
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Still deciding? Get samples of US$ 50000/Set
Request Sample

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
Export Year
1998-06-02
  • High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
  • High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
  • High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
  • High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
  • High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
  • High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Working Site
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Hfsf-200A
Condition
New
Drill Hole Diameter
130-300mm
Drill Hole Depth
200m
Bit Type
Diamond Bit
Drilling Way
Rotary
Type
Crawler
Drilling Diameter
130-300mm
Depth
200m
Engine Power
125kw
Rotary Torque
8000n.M
Drilling Angle
-100-15°
Horizontal Drilling Range
650-3970mm
Motor Specification
6K-390
Feeding Stroke
3500mm
Feeding and Lifting
45/65kn
Chassis Model
154
Weight
12000kg
Transport Package
Standard Export Packing or as You Needs
Specification
CE, ISO
Trademark
HF
Origin
Zhengzhou City, China
HS Code
843041
Production Capacity
30sets/Month

Product Description

Product Description

Specification

HFSF-200A full hydraulic crawler drilling rig is mainly used for tunnel pipe roof support holes and pilot exploration holes, anchor holes for urban deep foundation pits, perfusion reinforcement holes, large tonnage prestressed anchor holes or drainage holes for hydropower stations, railways and highways. Construction, and ground source heat pump hole construction, and take into account the construction of small foundation pile holes, hydrological well holes and blast holes.

High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel

Main feature

1.It has no dull pollution and no need air compressor when drill the incompact ground area,the gravel place and fragment rock stratum.

2.Special tube drilling technical,it can drilling fast and insure projects firmly.

3.In complex condition,it can use double tube rotating drilling,in order to make hole stable and easy to slip casting.

4.The drilling rig can be spplied for different technique methods and a variety of ground conditions.Especially in the different work condition,such as the incompact ground area,the gravel place,and the fragment rock stratume,this drilling can always provide the operator excellent solutions.

5.The speed of borehole is faster than traditional machine.

6.It has adopted top haydraulic rotart power head impact which is Germany imported,multi drilling, and excellence performance.

Product Parameters
Model  HFSF-200A
Borehole Depth(m) 200
Borehole Diameter(mm) 130-300
Drilling Angle(°) -100-15°
Horizontal drilling Range 650mm-3970mm
Drill Head Rotary Speed(FR/RE)(rpm) 30/60;54/108;62/124;105/210;
Output torque of driver power head(N.m) 8000
Motor Specification 6k-390
Feeding Stroke(mm) 3500
Feeding and lifting(kn) 45/65
Drill Head Diesel 6BTA5.9-C125
Engine Power(KW) 125kw@2200rpm
Chassis model       154
Overall Dimension(Drill Reduce Type)(mm) 7440*2300*2700
Weight(kg) 12000
Working Site

High Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel

Company Profile
High Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for TunnelHigh Efficiency Crawler Type 200m Engineering Drilling Rig for Tunnel
FAQ

1. Are you a trading company or a manufacturer?

We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.

2. How is the quality of your machine?
Our products pass strict quality inspections before they leave the factory to ensure that they are qualified before they are shipped.

3. How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.

4. Do you have after-sales service?
Yes, we have a dedicated service team that will provide you with professional technical guidance. If you need, we can send our engineers to your workplace and provide training for your employees.

5. How about quality assurance?
We provide a one-year quality guarantee for the main machine of the machine.

6. How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 20-25 days.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier